ISM Manufacturing PMI
October 1, 2014This data came out at 56.6 from an expected 57.0. Worse than expected that pushed cable on the upside after a double bottom down at 1.616 was formed also.
This data came out at 56.6 from an expected 57.0. Worse than expected that pushed cable on the upside after a double bottom down at 1.616 was formed also.